Construction Progress Monitoring
Rapid digitization of your construction site to measure progress and quality.
Traditional quantity surveying of complex construction sites is time-consuming, prone to errors, and requires travel. Gain accurate, real-time progress reports backed up by data with VEERUM construction progress monitoring.Tackle new infrastructure projects with accurate, accessible data and deliver results on time, under budget, and with minimal site exposure.
VEERUM FOR CONSTRUCTION PROGRESS MONITORING
Experience significant cost and time savings
15
%
Improved design productivity by 15%
50
%
Realized engineering cost savings of 50%
30
%
Reduced wellhead capital cost by 30%
Digitally verify construction progress with VEERUM
Automatically match project plans to reality from the safety and convienence of the home or office.

PROJECT CONTROLS
Easily communicate and understand what's happening on site with frequent, real-time construction progress reporting.
PROJECT MANAGEMENT
Ensure confidence in building outcomes and project schedule while guaranteeing project completion on time and on budget.


CONSTRUCTION MANAGEMENT
Proactively ensure that all construction activities are completed safely and efficiently. Guarantee a simple handover from construction to operations and maintenance.
Capabilities
VEERUM's application features are streamlined for schedule integrity of critical infrastructure.

Data integration
Search for and access your existing asset information attached to georeferenced objects within VEERUM’s application. Bring visual context to traditionally text-based data.
Progress and quality analytics
Access timely, accurate and complete progress and quality reports directly in the application. Identify and rectify issues in the digital world before they impact reality.
Time series data
Access the latest progress data with easy to analyze s-curves. Identify bottlenecks and enable remote planning with the latest progress information.
Conversations
Users can have threaded conversations directly in the 3D viewer with other stakeholders to quickly identify work order status and manage change.
How to digitally verify construction progress
1. DIGITIZE YOUR SITE
In order to detect construction issue that may impact scheduled project
completion, the site is digitized. The as-built facility as well as the interconnecting pipe spools that connect to the equipment in the facility are digitized and algorithmically matched to each other.

2. IDENTIFY MISMATCHES

Construction mismatches are detected by the VEERUM application. Algorithms identify whether pipes and steel are installed, not installed or installed out of tolerance.
3. PROGRESS VERIFICATION
% complete figures are calculated to measure progress. Rework is captured and any errors are easily identified.