Your team's workspace for operational success
Automatically match project plans to reality from the safety and convenience of the office with VEERUM DigitalTWIN




Project controls
Easily communicate and understand what's happening on site with frequent, real-time visualization of construction progress.
Project management
Ensure confidence in building outcomes and project schedule while guaranteeing project completion on time and on budget.
Construction management
Proactively ensure that all construction activities are completed safely and efficiently. Guarantee a simple handover from construction to operations and maintenance. Learn more about VEERUM's solution for operations and maintenance.
"We've removed countless hours of calls and driving to sites for confirmations. VEERUM has greatly improved productivity while reducing our costs and unnecessary field exposure."
Executive VP, Jupiter Resources
.png)
1. DIGITIZE
In order to detect construction issue that may impact scheduled project
completion, the site is digitized. The as-built facility as well as the interconnecting pipe spools that connect to the equipment in the facility are digitized and algorithmically matched to each other.


2. IDENTIFY MISMATCHES
Construction mismatches are detected by the VEERUM application. Algorithms identify whether pipes and steel are installed, not installed or installed out of tolerance.
3. PROGRESS VERIFICATION
Percent (%) complete figures are calculated to measure progress. Rework is captured and any errors are easily identified.


4. DRIVE VALUE THROUGH THE ENTIRE LIFECYCLE
VEERUM transforms construction management by offering real-time global insight into project progress. Our platform ensures transparency through digitally verified reports, reducing RFIs and enhancing project controls. Analyze historical progress and compare it to schedules or 4D BIM for comprehensive oversight.

Streamlined features for schedule integrity of critical infrastructure
Progress and quality
analytics
Time series data
Data integration
Conversations
Access timely, accurate and complete progress and quality reports directly in the application. Identify and rectify issues in the digital world before they impact reality.
Access the latest progress data with easy to analyze s-curves. Identify bottlenecks and enable remote planning with the latest progress information.
Search for and access your existing asset information attached to georeferenced objects within VEERUM’s application. Bring visual context to traditionally text-based data.
Users can have threaded conversations directly in the 3D viewer with other stakeholders to quickly identify work order status and manage change.
What's the VEERUM impact?
VEERUM's digital twin software will save your team hours of work every week.
15%
Improved design productivity
50%
Realized engineering cost savings
30%
Reduced wellhead capital cost